Identity area
Reference code
SD/Deeds/468.
Title
(A) Application for extension of time for the registration of the transfer of the advowson of St. Mary's, Pembroke; St ...,
Date(s)
- 1909, March 30. (Creation)
Level of description
File
Extent and medium
Context area
Name of creator
Archival history
Immediate source of acquisition or transfer
Content and structure area
Scope and content
(A) Application for extension of time for the registration of the transfer of the advowson of St. Mary's, Pembroke; St. Nicholas's, Monkton, from Morgan James Saurin, of Orielton, Pembroke, and William Mark Saurin, of the same place, to the Bishop of St. David's, Ernest Sutton Saurin, of Kensington, Gerald Louis Saurin, of the Royal Navy, and the aforementioned M. J. Saurin and W. M. Saurin, on 19th Feb, 1909. (B) Declaration in support of (a). (C) Application for registration of transfer. (D) Declaration in support of (c).
Appraisal, destruction and scheduling
Accruals
System of arrangement
Conditions of access and use area
Conditions governing access
Conditions governing reproduction
Language of material
Script of material
Language and script notes
Physical characteristics and technical requirements
Finding aids
Allied materials area
Existence and location of originals
Existence and location of copies
Related units of description
Notes area
Note
Preferred citation: SD/Deeds/468.
Alternative identifier(s)
Virtua system control number
vtls005222702
Project identifier
ISYSARCHB53
Access points
Subject access points
Place access points
Name access points
Genre access points
Description control area
Description identifier
Institution identifier
Llyfrgell Genedlaethol Cymru = The National Library of Wales