Identity area
Reference code
SD/Deeds/497.
Title
(A) 3 July 1916. Bishop's Authority for extension of time of registration of transfer of patronage of Nicholaston with Oxwich ...,
Date(s)
- 1916, July. (Creation)
Level of description
File
Extent and medium
Context area
Name of creator
Archival history
Immediate source of acquisition or transfer
Content and structure area
Scope and content
(A) 3 July 1916. Bishop's Authority for extension of time of registration of transfer of patronage of Nicholaston with Oxwich, Penrice and Reynoldston, from Emily Charlotte Talbot, of Margam Park, Glamorgan, to Thomas Mansel Franklen, of Cowbridge, Charles Leyshon Dillwyn Venables Llewellyn, of Llysdinam, Rads., Alfred Douglas Miller, of Wheatley, Oxfordshire, on 2 June 1916. (B) 3 July 1916. Application for the registration of the transfer of Nicholaston and Oxwich. (C) 3 July 1916. Application in respect of Penrice. (D) 3 July 1916. Application in respect of Reynoldston. (E) Declaration in support of b, c, d.
Appraisal, destruction and scheduling
Accruals
System of arrangement
Conditions of access and use area
Conditions governing access
Conditions governing reproduction
Language of material
Script of material
Language and script notes
Physical characteristics and technical requirements
Finding aids
Finding aid
Allied materials area
Existence and location of originals
Existence and location of copies
Related units of description
Notes area
Note
Preferred citation: SD/Deeds/497.
Alternative identifier(s)
Virtua system control number
vtls005222731
Project identifier
ISYSARCHB53
Access points
Subject access points
Place access points
Name access points
Genre access points
Description control area
Description identifier
Institution identifier
Llyfrgell Genedlaethol Cymru = The National Library of Wales