Identity area
Reference code
SD/Deeds/496.
Title
(A) 8 March 1915. Application for extension of time for registration of the transfer of the patronage of Llanfigan, Brecs ...,
Date(s)
- 1915, March. (Creation)
Level of description
File
Extent and medium
Context area
Name of creator
Archival history
Immediate source of acquisition or transfer
Content and structure area
Scope and content
(A) 8 March 1915. Application for extension of time for registration of the transfer of the patronage of Llanfigan, Brecs., from William Bowen, of Llangorse, Brecon, to William Powell Price, of Bulwark, Brecon, on 7 Feb. 1906. (B) Declaration in support of (a). (C) 9 March 1915. Bishop's Consent to (a). (D) 10 March 1915. Application for the registration of the transfer noted in (a). (E) Declaration in support of (d).
Appraisal, destruction and scheduling
Accruals
System of arrangement
Conditions of access and use area
Conditions governing access
Conditions governing reproduction
Language of material
Script of material
Language and script notes
Physical characteristics and technical requirements
Finding aids
Allied materials area
Existence and location of originals
Existence and location of copies
Related units of description
Notes area
Note
Preferred citation: SD/Deeds/496.
Alternative identifier(s)
Virtua system control number
vtls005222730
Project identifier
ISYSARCHB53
Access points
Subject access points
Place access points
Name access points
Genre access points
Description control area
Description identifier
Institution identifier
Llyfrgell Genedlaethol Cymru = The National Library of Wales