File SD/Deeds/485. - (A) Application for extension of time for registration of transfer of patronage of Eglwys Fach, from George Frank Paddock, of ...,

Identity area

Reference code

SD/Deeds/485.

Title

(A) Application for extension of time for registration of transfer of patronage of Eglwys Fach, from George Frank Paddock, of ...,

Date(s)

  • 1910, May-June. (Creation)

Level of description

File

Extent and medium

Context area

Archival history

Immediate source of acquisition or transfer

Content and structure area

Scope and content

(A) Application for extension of time for registration of transfer of patronage of Eglwys Fach, from George Frank Paddock, of Hanley, Stafford, and Albert Edward Paddock, of Brampton Lodge, Ross, Hereford, to James Barry Taunton, of Brynellen, Borth, county of Cardigan on 15 July 1903. (B) Authority for extension. (C) Application for registration. (D) Declarations re. details in (c).

Appraisal, destruction and scheduling

Accruals

System of arrangement

Conditions of access and use area

Conditions governing access

Conditions governing reproduction

Language of material

Script of material

Language and script notes

Physical characteristics and technical requirements

Finding aids

Allied materials area

Existence and location of originals

Existence and location of copies

Related units of description

Related descriptions

Notes area

Note

Preferred citation: SD/Deeds/485.

Alternative identifier(s)

Virtua system control number

vtls005222719

Project identifier

ISYSARCHB53

Access points

Subject access points

Place access points

Name access points

Genre access points

Description control area

Description identifier

Institution identifier

Llyfrgell Genedlaethol Cymru = The National Library of Wales

Rules and/or conventions used

Status

Level of detail

Dates of creation revision deletion

Language(s)

Script(s)

Sources

Accession area

Related subjects

Related people and organizations

Related genres

Related places

Physical storage

  • Text: SD/Deeds/485.